CVO Planning

From Finninday
Revision as of 19:36, 2 March 2010 by Rday (Talk | contribs)

Jump to: navigation, search

Planning tasks

Review prior art

  • squid
  • valve
  • swarm
  • collect available source
  • analyze available source
  • Winston waveform

Generate design docs

Prototype

  • install eclipse
  • benchmark Java vs Fortran
  • install BIRT, RCP