CVO Planning

From Finninday
Revision as of 19:36, 2 March 2010 by Rday (Talk | contribs)

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Planning tasks

Review prior art

    • squid
    • valve
    • swarm
  • collect available source
  • analyze available source
  • Winston waveform

Generate design docs

Prototype

  • install eclipse
  • benchmark Java vs Fortran
  • install BIRT, RCP