Project to do list: Difference between revisions

From finninday
Jump to navigation Jump to search
Line 26: Line 26:


===Done===
===Done===
* set up a terraria server
* set up a terraria server using haproxy
* fix [[broken hinge on kitchen cabinet]]
* fix [[broken hinge on kitchen cabinet]]
* automatically parse the weekly lesson ([[reverse-engineer auth and cookies]])
* automatically parse the weekly lesson ([[reverse-engineer auth and cookies]])

Revision as of 21:26, 26 April 2014

To do

  • set up a replacement for skype telephone service
  • block ads to tablets watching youtube over wifi
  • write point-of-sale software for reading rooms: Caesar
  • build a remote controlled submarine
  • set up a pair of microphones on opposite edges of the house to detect the speed of loud cars
  • set up a solar-powered raspberry pi to be a sensor communicating over wifi
  • use docker or vms to isolate all services
  • revisit puppet modules. Increase coverage of managed services. Use hiera.
  • puppetize laptop so every upgrade can be installed fresh
  • replace 1st gen drobo with a 3rd gen drobo
  • install logstash and elasticsearch
  • switch from xymon to nagios
  • install graphite
  • install IPA
  • install gitolite and cgit
  • install jenkins
  • install gerrit
  • install askbot
  • install drupal
  • install solr

Doing

Done